机房建设项目设计方案

strictlyforbidden headreaches mechanicalstroke range. 17th article: overheadtransmission line following work should blackout, cannot blackout Shi, due isolation protection measures, crane shall overheadtransmission line following work, through overhead transmission line should liftingarm falls, overheadline side work Shi, regardless anysituation Xia, lifting arm, overheadtransmission line recentlydistance should lessthan Xia table provides: transmission line voltage 1000 following1-15 kV 20-40 kV 60-110 kV 220,000 Allowminimum distances transmissionline vertical1.5 level 18th:lamp voltage may exceed36 volts, when working dampplace metalcontainers, lamp voltage may exceed12 volts. 19th: pressure vessel should have safetyvalve, pressure gauge, avoidsun exposure, collisions, oxygen cylinders preventcontaminated oil; acetylenegas, LPG, must have safetydevice preventtempering. 20th: x-ray gamma-rayflaw detector operation area, non-operator, enter.Article 21st: corrosion, dust toxicwork, protective measures carryout regular inspection. Spider-man 22nd section III: Spider-man regularmedical examinations medicaldiagnosis, who suffer from high blood pressure, heart disease, anemia, epilepsy otherdiscomfort Spider-manshall aerialwork. 23rd: Spider-man dressed spirit, banned hardbottom easyslip-on shoe nail. 24th: Spider-man material stack stationary, tools should turn toolbag, transfer prohibited throwing objects.25th: badweather abovegrade) construction safety, prohibition openair, lifting piling.26th article: ladder shall deficiencydocument, paddedusing, ladder cross document spacing 30cm suitable, using Shi top tiedprison, bottom should take anti-sliding measures, single ladder groundangle 60degrees suitable, ban II people while ladderShang job, neededrec eived long using, should lashing firm, people Word ladder feetpulled prison, usingladder, due guardianship setfence. 27th: securitymeasures, prohibited hipjoints, supports, trusses rooftruss cantilever beams, halffixed widget Nine,ten basic security preventvehicle damage claim withoutlegal training qualifiedcertified personnel vehicleperformance shouldinsist doingdefense work, vehicle brake, Horn, steering systems, lighting othersafety components allowedout dumptruck, dump truck car hop strictlyprohibited, prohibited goods mixing, loading vehiclesshould strictlyforbidden headreaches mechanicalstroke range. 17th article: overheadtransmission line following work should blackout, cannot blackout Shi, due isolation protection measures, crane shall overheadtransmission line following work, through overhead transmission line should liftingarm falls, overheadline side work Shi, regardless anysituation Xia, lifting arm, overheadtransmission line recentlydistance should lessthan Xia table provides: transmission line voltage 1000 following1-15 kV 20-40 kV 60-110 kV 220,000 Allowminimum distances transmissionline vertical1.5 level 18th:lamp voltage may exceed36 volts, when working dampplace metalcontainers, lamp voltage may exceed12 volts. 19th: pressure vessel should have safetyvalve, pressure gauge, avoidsun exposure, collisions, oxygen cylinders preventcontaminated oil; acetylenegas, LPG, must have safetydevice preventtempering. 20th: x-ray gamma-rayflaw detector operation area, non-operator, enter.Article 21st: corrosion, dust toxicwork, protective measures carryout regular inspection. Spider-man 22nd section III: Spider-man regularmedical examinations medicaldiagnosis, who suffer from high blood pressure, heart disease, anemia, epilepsy otherdiscomfort Spider-man shall aerialwork. 23rd: Spider-man dressed spirit, banned hardbottom easyslip-on shoe nail. 24th: Spider-man material stack stationary, tools should turn toolbag, transfer prohibited throwing objects.25th: badweather abovegrade) construction safety, prohibition openair, lifting piling.26th article: ladder shall deficiencydocument, paddedusing, ladder cross document spacing 30cm suitable, using Shi top tiedprison, bottom should take anti-sliding measures, single ladder groundangle 60degrees suitable, ban II people while ladderShang job, neededreceived long using, should lashing firm, people Word ladder feetpulled prison, usingladder, due guardianship setfence. 27th: securitymeasures, prohibited hipjoints, supports, trusses rooftruss cantilever beams, halffixed widget Nine,ten basic security preventvehicle damage claim withoutlegal training qualifiedcertified personnel vehicleperformance shouldinsist doingdefense work, vehicle brake, Horn, steering systems, lighting othersafety components allowedout dumptruck, dump truck car hop strictlyprohibited, prohibited goods mixing, loading vehiclesshould overload,机房建设设计方案 3.1设计依据............................................................................................................ 3.2设计要求............................................................................................................ 4.1建设部分 4.2系统组成各部分说明 项目设计方案.........................................................................................................10 5.1 空调新风系统 .....................................................................................................10 5.1.1 空调新风系统设计依据 ............................................................................10 5.1.2 空调技术要求 115.1.3 机房新风系统 ..........................................................................................12 5.2 电气设计 ...........................................................................................................13 5.2.1 设计依据 .................................................................................................13 5.2.2 供电电源 .................................................................................................13 5.2.3 不间断供电设计 ......................................................................................14 5.3 配电设计 ...........................................................................................................17 5.3.1 动力、辅助电源及市电照明配电 ..............................................................17 strictlyforbidden headreaches mechanicalstroke range. 17th article: overheadtransmission line following work should blackout, cannot blackout Shi, due isolation protection measures, crane shall overheadtransmission line following work, through overhead transmission line should liftingarm falls, overheadline side work Shi, regardless anysituation Xia, lifting arm, overheadtransmission line recentlydistance should lessthan Xia table provides: transmission line voltage 1000 following1-15 kV 20-40 kV 60-110 kV 220,000 Allowminimum distances transmissionline vertical1.5 level 18th:lamp voltage may exceed36 volts, when working dampplace metalcontainers, lamp voltage may exceed12 volts. 19th: pressure vessel should have safetyvalve, pressure gauge, avoidsun exposure, collisions, oxygen cylinders preventcontaminated oil; acetylenegas, LPG, must have safetydevice preventtempering. 20th: x-ray gamma-rayflaw detector operation area, non-operator, enter.Article 21st: corrosion, dust toxicwork, protective measures carryout regular inspection. Spider-man 22nd section III: Spider-man regularmedical examinations medicaldiagnosis, who suffer from high blood pressure, heart disease, anemia, epilepsy otherdiscomfort Spider-manshall aerialwork. 23rd: Spider-man dressed spirit, banned hardbottom easyslip-on shoe nail. 24th: Spider-man material stack stationary, tools should turn toolbag, transfer prohibited throwing objects.25th: badweather abovegrade) construction safety, prohibition openair, lifting piling.26th article: ladder shall deficiencydocument, paddedusing, ladder cross document spacing 30cm suitable, using Shi top tiedprison, bottom should take anti-sliding measures, single ladder groundangle 60degrees suitable, ban II people while ladderShang job, neededreceived long using, should lashing firm, people Word ladder feetpulled prison, usingladder, due guardianship setfence. 27th: securitymeasures, prohibited hipjoints, supports, trusses rooftruss cantilever beams, halffixed widget Nine,ten basic security preventvehicle damage claim withoutlegal training qualifiedcertified personnel vehicleperformance shouldinsist doingdefense work, vehicle brake, Horn, steering systems, lighting othersafety components allowedout dumptruck, dump truck car hop strictlyprohibited, prohibited goods mixing, loading vehiclesshould overload,ultra-high ultrawide strapping should reliable,should prevent carunstable objects falling hurts. safeplace, head, hands bodyshall avoidvehicles falls when you start braking. constructionsite, pitch turning, reversing, when driving narrowspace should sitetraffic comes slowdown "four-speed",namely: road conditions unknown slow,bad line slowly, slower start, passing, parking, narrow roads, detours, road bridges, forks road, slow pedestrians crowded locations accessdoor. scaffoldingnear motorwayoperation area otherfacilities, barricadesshall roadsafety labels, safety signs protectivemeasures, adequatelighting whenloading unloadingoperation, vehiclesparked wedge-shapedpieces eitherside motorvehicles should avoid walking rightside, unevenrows obstructtraffic; avoid vehicle, should avoidtwo car intersection, deadstanding next parkinglot could backdown. 10, motor vehicles towing vehicle brakes,traction object objects shall betweentraction whentraction youwere allowed bottom.Ten, fallsfrom height,object hit ten basic safety requirements heightmust neat,do wearplastic bottom-sliding shoes, high heels, tools should turn toolbag. highoperating personnel strictlyprohibited fighteach other, so climbingoperations, structure must reliableclimbing equipment, must varioustypes hand-heldequipment should checkedbefore use ensuresafe secure.Edges openingjob preventing objects falling. constructionworkers should channelup down,do climbscaffolding, across balcony,climbing non-providedchannel. vacantjobs, should have firmfoothold properlytie off belts field should configureddepending circumstances-blocks,railings othersafety devices. whenworking height,all items should stackedsmooth, can whendemolition work high,disassembly materials,construction waste should cleanedup timelymanner, anychaos walkwayplaced droppeddown, keep working aislesclear. whenworking throwup otherobjects. 10, constructionsite, where fallmay anymaterial, should fixed,demolition work restrictedarea, unde supervised5.3.2 插座 ........................................................................................................17 5.3.3 电缆 .......................................................................................................17 5.4 机房系统安全设计 ..............................................................................................18 5.4.1 设计依据 .................................................................................................18 5.4.2 防雷设计 .................................................................................................18 5.4.3 接地要求 .................................................................................................18

机房建设项目设计方案

文档格式:
.doc
文档页数:
45页
文档大小:
521.0K
文档热度:
文档分类:
建筑/环境 --  智能建筑
文档标签:
机房 建设项目 机房建设项目 设计方案

更多>> 相关文档

页面底部区域 foot.htm